No products
Boeing 737 Forward overhead Frame Manufacturing lead-time 14 to 28 days
Boeing 737 Forward overhead Frame Manufacturing lead-time 14 to 28 days
Boeing 737 AFT Overhead annunciators With LED Boxes
Boeing 737 AFT Overhead annunciators Without LED Boxes
Boeing 737 Complete pedestal set of panels Estimate Lead time 2 to 4...
FOHFRAM
New product
Boeing 737 Forward overhead Frame
Manufacturing lead-time 14 to 28 days
Forward overhead Frame designed for our overhead panels,
the Material:
The material is Dibond, its Lightweight and rigid, it consists of a flexible polyethylene core covered with a thin aluminium sheet on each side, and is finished with our usual RAL 7011 Matt colour